We are excited to see the results at Erectoweld in Oakville Ontario with KVAR Hydro savings and increase Power Factor from the mid 80% to the mid 90% of which now takes away all penalties and reduces all other costs of the Hydro bill. KVAR along the ECO-Clamp for Fuel savings helps to combat other increased cost.